This project includes the Phase I studies of the Aysak Artificial Groundwater Recharge Project in Sarayan County, conducted with the aim of assessing technical feasibility and identifying appropriate solutions for strengthening groundwater resources. The studies involve evaluating the hydrological, hydrogeological, geological, and topographical conditions of the area, assessable surface water resources, aquifer recharge potential, suitable locations for project implementation, and preliminary engineering alternatives, in order to provide the necessary basis for sustainable groundwater resource management and subsequent design stages.




